public interface UpgradeTask
Modifier and Type | Interface and Description |
---|---|
static class |
UpgradeTask.ScheduleOption |
static class |
UpgradeTask.Status
Track status of a task this session, if isTaskDone(String) returns true you don't need to do it again.
|
Modifier and Type | Method and Description |
---|---|
Integer |
dependsUpon()
Return the Upgrade task id of another upgrade task that must be run prior to this task.
|
void |
doUpgrade(boolean setupMode)
Perform the upgrade.
|
int |
getBuildNumber() |
Collection<String> |
getErrors()
Return any errors that occur.
|
UpgradeTask.ScheduleOption |
getScheduleOption()
Return when this upgrade task can be scheduled.
|
String |
getShortDescription()
A short (<50 chars) description of the upgrade action
|
boolean |
isDowngradeTaskRequired()
Flag to claim whether this upgrade task needs an explicit downgrade task to reverse the data changes in Jira-Server.
|
int getBuildNumber()
String getShortDescription()
void doUpgrade(boolean setupMode) throws Exception
setupMode
- Indicating this upgrade task is running during set up.Exception
@Nullable Integer dependsUpon()
UpgradeTask.ScheduleOption getScheduleOption()
Collection<String> getErrors()
boolean isDowngradeTaskRequired()
If a downgrade is a simple no-op then return false, and JIRA will ignore these changes during a downgrade.
If you need to actually undo the changes made here then declare true and add a Downgrade Task to the bug fix branch.
Copyright © 2002-2023 Atlassian. All Rights Reserved.